Engineering Designer Guide
WP-7: Essential Rack System Requirements for Next Generation Data Centers
Effective mission critical installations must address the known problems and challenges relating to current and past data center designs. This paper presents a categorized and prioritized collection of rack system challenges and requirements as obtained through systematic user interviews.
English PDF
(rev. 2)
WP-37: Avoiding Costs From Oversizing Data Center and Network Room Infrastructure
The physical and power infrastructure of data centers and network rooms is typically oversized by more than 100%. Statistics related to oversizing are presented. The costs associated with oversizing are quantified. The fundamental reasons why oversizing occurs are discussed. An architecture and method for avoiding oversizing is described.
English PDF
(rev. 4)
WP-72: Five Basic Steps for Efficient Space Organization within High Density Enclosures
Organizing components and cables within high density enclosures need not be a stressful, time consuming chore. In fact, thanks to the flexibility of new enclosure designs, a standard for organizing enclosure space, including power and data cables can be easily implemented. This paper provides a five step roadmap for standardizing and optimizing organization within both low and high density enclosures, with special emphasis on how to plan for higher densities.
English PDF
(rev. 0)
WP-76: Modular Systems: The Evolution of Reliability
Nature proved early on that in complex systems, modular designs are the ones that survive and thrive. An important contributor to this success is the critical reliability advantage of fault tolerance, in which a modular system can shift operation from failed modules to healthy ones while repairs are made. In data centers, modular design has already taken root in new fault tolerant architectures for servers and storage systems. As data centers continue to evolve and borrow from nature’s blueprints, IT reliability analysis must also evolve to understand new strategies for survival, recovery, and growth.
English PDF
(rev. 0)
WP-81: Site Selection for Mission Critical Facilities
When selecting a new site or evaluating an existing site, there are dozens of risk factors that must be considered if optimal availability is to be obtained. Geographic, site-related, building, and economic risks need to be understood and mitigated to lessen the downtime effects on your business. In this paper guidelines are established for selecting a new site or assessing an existing one. Common risks that affect the availability of a business are defined and techniques for minimizing these risks are presented.
English PDF
(rev. 0)
WP-116: Standardization and Modularity in Network-Critical Physical Infrastructure
Failure to adopt modular standardization as a design strategy for Network-Critical Physical Infrastructure (NCPI) is costly on all fronts: unnecessary expense, avoidable downtime, and lost business opportunity. Standardization and its close relative, modularity, create wide-ranging benefits in NCPI that streamline and simplify every process from initial planning to daily operation, with significant positive effects on all three major components of NCPI business value – availability, agility, and total cost of ownership.
English PDF
(rev. 0)
Disclaimer: Information at this site is provided solely for the user's information and, while thought to be accurate, is provided strictly "as is" and without warranty of any kind. APC, its agents, employees or contractors will not be liable to you for any damages, direct or indirect, or lost profits arising out of your use of information provided at this site, or information provided at any other site that can be accessed from this site. Unauthorized attempts to upload information or change information on this website are strictly prohibited and may be punishable under the Computer Fraud and Abuse Act of 1986 and the National Information Infrastructure Protection Act. Information may also be used for authorized law enforcement investigations. Copyright © 2009 APC, All rights reserved.